Humo Arena
(Tashkent, Uzbekistan)
| Project name: | Humo Arena |
| Client: | ENTER Engineering |
| Location: | Tashkent, Uzbekistan |
| Architect: | Heerim Architects, PI Arena |
| Contractor: | HC Binokor, Humo Tashkent |
| Project type: | New construction |
| Number of floors: | 5 |
| Area: | 97.144 sq.m |
| Capacity: | 12.500 pers. |
| Construction completed: | 2019 |
| Scope: | Structures excluding the roof |
| Role of Dforce team: | Schematic Design, Design Development, Construction Documents |

